Scaffolding Products East Amherst NY

Climbing scaffolding systems come in four sizes and keep the wall and materials waist-high all day for better production. The VIP is designed for brick veneers and interior partitions up to 12-ft high.

E J Militello Concrete Inc
(716) 636-2288
6465 Transit Rd
East Amherst, NY
 
Ajax Smith, Inc.
(716) 877-1126
4000 River Rd.
Tonawanda, NY
 
Agl Land Design Inc
(631) 673-2854
19 Duncan Ln
Huntington, NY
 
Ipek Z & Sons Inc
(518) 371-2544
7 Railroad Ave
Albany, NY
 
Peter Home Improvements Corp
(718) 699-8441
5841 Waldron St
Flushing, NY
 
DM Padovano Construction
(716) 553-7447
320 Irvington Dr
Tonawanda, NY
 
Colonie Masonry Corp Of Albany Inc
(518) 370-2471
1971 Western Ave # 231
Albany, NY
 
Viau Constr Corp
(315) 472-0171
785 Erie Blvd W
Syracuse, NY
 
Capstone Construction
(631) 784-7701
775 Park Ave
Huntington, NY
 
Patriot Masonry & Construction,Inc.
(607) 988-6561
81 Willow St
Otego, NY
Services
Full Masonry & Construction services
Hours
M-F 8am-5pm

Scaffolding Products

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: May 1, 2007

By MASONRY CONSTRUCTION Staff

System designed for brick laying

The Total Scaffold System is a modular approach with all components engineered to lock onto a rosette so few parts are needed. The system is designed for brick laying, can be adapted to overcome steep angles and irregular shapes, and is well suited for restoration and renovation projects.

  • Etobicoke Ironworks Ltd., 416-742-7111, www.eiw-ca.com

Scaffolds erected quickly and easily

With a drop-in-place bridge, pass-through wall ties, and fewer parts (no chains, bolts, or cross braces), these scaffolds assemble quickly and easy. Every tower is legal to climb and has an access platform for safe and easy access. They have 5000-lb capacities, extension trusses that allow for up to 13-ft extensions anywhere along the platform, and are rated up to 550-ft high.

  • EZ Scaffold Corp., 800-699-6831, www.ezscaffold.com

Matching wall height and materials

Climbing scaffolding systems come in four sizes and keep the wall and materials waist-high all day for better production. The VIP is designed for brick veneers and interior partitions up to 12-ft high. The Junior is used for residential and light construction and has an 80-ft maximum working height. The Beast tops out 36-ft walls while free standing with a 301-ft maximum height. The Heavy-Duty has a maximum height of 552 ft.

  • Non-Stop Scaffolding, 800-845-0845,

Click here to read full article from Masonry Construction